65% of Al Qudra-Lehbab crossing work complete, says RTA chief
17 Aug 2019
“The Project includes the construction of two bridges on the collector road as well as ramps to serve right, left and U-turns. The project works also cover widening connecting streets, and a cycling bridge in addition to lighting works, rainwater drainage systems, and utility lines.