Classifieds | Archives | Jobs | About TGT | Contact | Subscribe
 | 
Last updated 3 minutes ago
Printer Friendly Version | TGT@Twitter | RSS Feed |
HOME LOCAL MIDEAST ASIA WORLD BUSINESS SPORT OPINION WRITERS
Masdar joint venture Hywind Scotland surpasses targets
February 16, 2018
 Print    Send to Friend

ABU DHABI: As the UAE celebrates Innovation Month in February, the developers of Hywind Scotland, the world’s first commercial-scale floating wind farm, have reported better than expected results in the first three months of the project’s operations, with cutting-edge technology playing an important role.

A joint venture between Statoil (75%) and Masdar, Abu Dhabi Future Energy Company (25%), the 30-megawatt (MW) wind farm located 25 kilometres off the coast of Peterhead in Aberdeenshire has been powering around 20,000 households since it was launched last October.

In that short time the project has withstood one hurricane, one winter storm and waves as high as 8.2 metres, with production and availability above target in each of the three months from November to January.

The typical capacity factor for an offshore wind farm in winter, when the wind is at its strongest, is 45-60 per cent. Hywind Scotland, however, achieved an average of around 65 per cent (a capacity factor of 100% means all wind turbines are generating their maximum output around the clock).

“These outstanding results illustrate the durability of floating wind technology and its ability to perform safely and above target in the toughest conditions,” said Bader Al Lamki, Executive Director for Clean Energy at Masdar. “The extremely encouraging performance of Hywind Scotland is positive news for the development of future floating wind projects with our partners, and supports ongoing efforts to improve the cost efficiency of floating wind.”

Hywind Scotland’s first encounter with extreme weather was Hurricane Ophelia last October when wind speeds of 35 metres/second (m/s) were recorded. Storm Caroline in early December was even stronger, with gusts in excess of 45 m/s (160 km/h) and waves as high as 8.2 metres.

Hywind Scotland’s wind turbines shut down for safety reasons when the storms were at their peak, but promptly resumed operations afterwards automatically. A purpose-built pitch motion controller integrated with the turbine’s control system mitigates excessive movement.

“Knowing that up to 80 per cent of the offshore wind resources globally are in deep waters, where traditional bottom-fixed installations are not suitable, we see great potential for floating offshore wind - in Asia, the west coast of North America and Europe,” said Irene Rummelhoff, Executive Vice President for New Energy Solutions at Statoil.

Masdar has formed a strategic partnership with Statoil, Norway’s international energy company, to pursue joint offshore wind projects. The two companies are also developing the battery storage project Batwind, which will store power generated by Hywind Scotland.

WAM
 

Add this page to your favorite Social Bookmarking websites
Comments
 
Post a comment
 
Name:
Country:
City:
Email:
Comment:
 
    
    
Related Stories
Masdar City to host ‘Green Run’ with Environment Friends
ABU DHABI: Masdar City, Abu Dhabi’s sustainable urban community, will host hundreds of runners at its annual Green Run on Friday, Feb 22. Organised in collaboration wi..
Ministry, Masdar tie up on sustainability education
ABU DHABI: Masdar, the Abu Dhabi Future Energy Company, is collaborating with the UAE Ministry of Education on its Innovation Ambassador Program 2019, it was announced o..
AD Convention Bureau, Masdar showcase Audi’s Electric SUV
ABU DHABI: Abu Dhabi Convention Bureau, part of the Department of Culture and Tourism - Abu Dhabi (DCT Abu Dhabi), has helped launch the latest ground-breaking electric v..
Masdar helps residents become self-sufficient in meeting their everyday food needs
ABU DHABI: Masdar City in Abu Dhabi has unveiled a Smart Home Farming Showcase called “Bustani” at its Eco-Villa prototype to demonstrate emerging farming solutions that ..
Masdar installs first wind turbine in Oman
Abu Dhabi: Masdar, the Abu Dhabi Future Energy Company, announced the installation of the first of 13 turbines at the 50 megawatt (MW) Dhofar Wind Farm. Located in the so..
FRONTPAGE
 
GALLERY
 
PANORAMA
 
TIME OUT
 
SPORT
 
 
Advertise | Copyright